Cenveo
St. Louis, Missouri

  • 150,000 SF Interior Renovation
  • 20,000 SF of Office and Plating Build-out
  • Two (2) New Receiving Docks with 40,000 lb Dock Levelers and Truck Restraints
  • New Concrete Entry for Office Employees
  • New Reinforced Concrete Foundations for All Large Presses
  • 5,000 Amp Electrical Service
  • Foundations and Structural Steel Support Columns/Bracing for Two (2) “Future” Mezzanines
  • Modified Existing ESFR Fire Sprinkler System to Accommodate the New Space
  • Modified Existing /Provided New Plumbing for New Office Areas
  • Modified Existing Compressed Air Piping and Connections to Allow for Centralized Compressor Area
  • Upgraded Gas Service to 5 PSI for Web Presses and RTO Clean Switch
  • Provided Power and Final Connections to Three (3) Large Web Presses, Four (4) Large Sheet Presses, and a Variety of Additional Presses and Equipment Dining Area, Library, Living Rooms with Fireplaces, Conference Room, Physical and Occupational

Weekends Only
Manchester, Missouri

  • 112,500 SF Full Building Renovation
  • 70,000 SF Furniture Showroom
  • 2,000 SF New Office/Finance Space
  • New 4,000 SF Customer Pick-Up Canopy
  • New Exterior Elevation
  • Refurbished Concrete Floors with Stained Aisles
  • T-5 High-Bay Lighting
  • Accent Lighting Throughout Store
  • CCTV and Speaker System
  • Concept to Grand Opening in Five Months

500 North Broadway
St. Louis, Missouri

  • ±2500 SF Lobby Renovation & Streetscape Upgrade
  • Maintained 100% Building Uptime for 24-hour Access Through Multiple Phases
  • Relocated Building Systems to Temporary Security Desk & Back Without Downtime
  • Structural Repairs & Waterproofing to Elevated Slabs
  • Repaired Precast Column Bases with Salvaged Stone from Demolition
  • Overhead Suspended Structural Frameless Glazing System
  • Frameless Revolving Glass Doors
  • Turkish Marble Wall Slabs and Floor Tile
  • Perimeter Cove Lighting
  • Upgraded Building Signage Package
  • Installed New Valet Lane & ADA Access Ramps on Broadway

SLEDD Company
Wheelving, West Virginia

  • 82,325 SF Warehouse Addition and Office Renovation
  • 32’ Clear Height in Warehouse
  • 15,457 SF -10°F Freezer
  • 1,485 SF -20°F Freezer
  • 10,972 SF +34°F Cooler
  • 16,024 SF +40°F Cold Dock
  • 37,529 SF Dry Warehouse
  • 4,466 Office Addition & 22,407 SF Office TI
  • Insulated Metal Panel Warehouse Walls
  • Fluorescent Motion Sensor Lighting in Warehouse and LED Lighting in Freezer
  • Quell Double Interlock Pre-Action Fire Protective System for Freezer and Coolers
  • ESFR Fire Protection System for Dry and Cold Dock Areas
  • 60 mil Mechanically Attached TPO Roof System
  • Electric Under-Floor Heating System in Freezer
  • Individual Packaged Split Freon Refrigeration Systems

O’Hare Auto Group
Des Plaines, Illinois

  • 29,000 SF Renovation
  • New Vehicle Delivery and Honda “Blue Can” Entry Feature
  • New Honda Generation II Prototype Showroom Equipped with Wireless Internet Information Center
  • Renovation of Service Write-Up, Offices and Parts Storage, Including Flooring, Lighting and Painting
  • Full Renovation Complete in Four Months while the Dealer was in Full Operation

Premier Eye Associates
St. Louis, Missouri

  • 3,135 SF Tenant Improvement for Eye Care Specialists/Ophthalmology Practice
  • 2nd Floor Tenant
  • Four (4) Exam Rooms; Optical Lab; Testing Area; Field Vision Test Area; Reception/Waiting Area; Staff Break Area
  • Scope Incorporated Specialty Soffit and Upgraded Finishes
  • Project Completed in Ten (10) Weeks

Digital Realty Data Center
St. Louis, Missouri

  • Installed 18-section 13.8-kV Switchgear
  • Installed Two (2) 2-MW Unit Substations
  • Performed Switch-Over of Building Power from Utility Transformer to New MV Gear
  • Moved 2-MW Generator to Ground-Level
  • Performed Structural Upgrades to Existing Facility Basement for Generator Support
  • Installed a 2-Tank Generator Fuel-System in Containment Vault Underneath Existing Sidewalk
  • Doubled Load-Capacity of 9th and 10th Floors of Existing Facility with Structural Steel
  • Decommissioned Elevator, Separated from Common-Shaft and Crated 11-story Mechanical Shaft with Platforms at Each Level
  • Upgraded Building Fire-Alarm System to High-Rise System

Bud Dome III
St. Louis, Missouri

  • Existing Building Structural Renovation to allow for Indoor Ball Field Recreation Area
  • Removal of Four (4) Columns at 44’x44’ Bay Grid to allow Clear Span of 134’ x 132’ Area
  • Minimal Reduction in Clear Height to Accommodate New Span with Steel Structure
  • Mechanical System Upgrades for Conditioning of Space for Use
  • New T5 Fluorescent Light Fixtures for Play Area Illumination
  • Perimeter Protection and Safety Netting Installed
  • New Artificial Turf and Baseball Diamond Configuration
  • Coordination of all Design and Zoning for Implementation and New Proposed Use

Restaurant Depot
Marietta, Georgia

  • 49,500 SF Renovation to Existing Retail Store
  • 10,700 SF of 40o Cooler area
  • 4,575 SF of 10o Freezer area
  • 1,800 SF Office Space
  • Three (3) Dock Positions
  • ESFR Sprinkler System